Brewery building before any work was carried out

16 Jun 2014

Brewery building before any work was carried out

June 16, 2014History

1/9/2004 This picture shows the state of the brewery building before any work was carried out. Electricity and water have since been connected up. All drains are now in place. Unrequired internal walls have been removed.